cancel
Showing results for 
Search instead for 
Did you mean: 

single cycle paln for multiple equipment

Former Member

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

Hi,

in the single cycle plan you can assign for each item the equipment and then it will create for each equipment and work order.

Former Member
0 Kudos

hi,

can you give me tutorial step by step?and setting configuration SPRO for preventive maintenance.

thanks

Answers (1)

Answers (1)

peter_atkin
Active Contributor
0 Kudos