cancel
Showing results for 
Search instead for 
Did you mean: 

SAP How to detect schedule lines change in EKET after MRP run

former_member686737
Discoverer
0 Kudos
264

Hi everyone,

i'm trying to figure out a way to detect which schedule lines are modified or created by the MRP run in table EKET.

I need to know if there has been a change in the schedule lines of a particular schedule agreement position, over a period of time.

In tables CDHDR/CDPOS there isn't any trace about modification.

Is there a way to check the situation about the schedule lines before the MRP and after the MRP run ? Maybe a BADI or an EXIT ?

Thank you all.

Accepted Solutions (0)

Answers (0)