Dear Friends,
I have configured the SAP EPC 3.0 with Oracle Primaver 16.2 while running the configuration wizard in AS Java system i have faced an issue while testing connection between SAP and Oracle primavera. It is reading version and details of Primavrera but showing an Jrmp exception error in the log.
Kindly help if anyone have faced the issue and resolved.

Request clarification before answering.
Hi ,
We are facing issue in SAP & Primavera Connection, Actual % & Actual finish dates are not being pushed back to Primavera, can somebody enlighten with solution?