on ‎2018 Apr 01 4:26 AM
HI There,
SAP EPC is already installed and upgraded the patch to SAP EPC 2.0 SP3 by SAP Basis Consultant.
May I know what all tasks to be done by SAP EPC Consultant and what are Mappings/Configurations required and where to do this integration in SAP ABAP and Oracle Primavera ?
Kindly Help !!!
Request clarification before answering.
Dear Chowkhan,
Depending on your version and requirements you can gather hints from the following notes. These give all detail steps and requirement for Primavera integration.
2297855 - SAP EPC Primavera P6 EPPM Integration: setup/settings/troubleshooting
2486928 - SAP EPC Primavera P6 EPPM configuration using Primavera P6 EPPM Integration API: setup/settings/troubleshooting
2486959 - SAP EPC Oracle Primavera P6 EPPM configuration using Oracle Primavera Web Services: setup/settings/troubleshooting
2478323 - Primavera P6 EPPM integration using SAP EPC Primavera Web Service Adaptor
Best Regards,
Barnabás Paksi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Barnabás Paksi,
Thanks for the SAP Notes - Will walkthrough it !
we recently upgraded to SAP EPC SP3 in SAP TRN Client.
As a Result,
May I know the Relevant Datatype in Package /SEPC/UI of SAP EPC SP3 in SAP TRN.
Your help is deeply appreciated.
Thanks
Firoz Khan.
+91 8095061015
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.