on 2020 Sep 18 7:18 PM
Is there a way to enable to multi-select material objects in the ECTR desktop and change the plant specific status (MAT-SSSTA) the same that x-plant status (MAT-MSTAE) is changed with context menu ?
The field is visable after setting SU3 User Parameter WRK to match the user Plant number.
Request clarification before answering.
User | Count |
---|---|
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.