cancel
Showing results for 
Search instead for 
Did you mean: 

Root a new master document to a drawing (SAP/ECTR)

lostsicilian
Explorer
0 Kudos
302

My Drawing in the ECTR has no master document rooted. So my question, how can I root a document manually? I already addet to the document-bom the Document I want as the master. Is there something else to do?

Accepted Solutions (0)

Answers (1)

Answers (1)

GerhardHimmelsb
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello Massimo,

did you assign in Solidworks a 3D model to the drawing?

This is mainly driven from CAD. Then this relation is saved during checkin.

Hope this helps.

Regards,

Gerhard