1.when I go to CG02 transaction to change a specification, somehow the Change Number field is greyed out. I am not able to make any changes using Engineering Change. How to correct this, so I can change specifications (real_sub) using change masters ?
2. Also I can link material master from specification. Basically from inside the view of specification I can see Material Master linked to it. Can I do the reverse, somehow from inside Material master can I see the specifications assigned to it ?.
Thanks,
Sachin
Request clarification before answering.
Hallo Sachin,
1. to work with change numbers you have to select the valid change number in the starting selection screen og CG02.
To do this, click on the header "Key date for editing" and enter the change number here.
2. from my understanding there is no way to see assigned specifications from the material master. But you can use the serach option in the starting screen of CG02 and enter a material here to see which specifications are assigned.
Best regards,
Christoph
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Christoph / Sachin,
Small correction to what Christoph said, it is possible to do the reverse - I mean assign and see the specification from material Master. Carry out IMG activity - Set Up Specification assignment in Material Master, in which you need to add appropriate screen number.