1.when I go to CG02 transaction to change a specification, somehow the Change Number field is greyed out. I am not able to make any changes using Engineering Change. How to correct this, so I can change specifications (real_sub) using change masters ?
2. Also I can link material master from specification. Basically from inside the view of specification I can see Material Master linked to it. Can I do the reverse, somehow from inside Material master can I see the specifications assigned to it ?.