on 2017 Feb 20 3:19 AM
We have a requirement to have Quality Inspections for Handling Units for GR from production, we are able to generate the inspection lots for the GR Batch from Process Order with HU with the below settings –

We are doing Process order GR through COP2 or COP1 and COWBHUWE and when we have multiple quantity GR, the inspection lot gets created for that quantity, and it allows to perform separate usage decision for different HUs, but we are unable to record results for individual HUs.

Appreciate your help to suggest the way to have inspection lots for individual HUs or individual Result Recording for HUs when we have multiple Qty in an inspection lot.
Note – we referred the below relevant SAP help link but couldn’t follow it correctly
https://help.sap.com/erp2005_ehp_07/helpdata/en/83/8cbf53f106b44ce10000000a174cb4/content.htm
Note
In theHandling Unit Monitorone inspection lot is created per material/batch when you perform a transfer posting ofseveralhandling units. When you use theGoods Movements for Handling Units and Materials function, the system creates an inspection lot foreveryhandling unit.
We are following the same – goods movements for Handling Units and Materials, but not sure what is missing.
Thanks,
Ravindra Kulkarni