on 2009 Jul 15 11:36 AM
Hi experts,
has anyone an idea to really enable the ressource management of a new installed cprojects 4.5 system (without WFM-Server)? I did use the ressource management in cprojects last year at a cp 4.0 installation but this time it doesn't work at all.
We have two unsolved questions which should belong together:
I. Two errors when you start cProjects: "Communication with the WFM Core system is not possible" and "WFD not yet converted". But the WFM-/WFD-Server is not intended to be used. There should be no messages (see customizing).
II. The complete area of ressource management in cProjects is empty and gray - no possibility to define any new project role and there is no predefined project role. It is possible to define project structures using different project types.
The system: cProjects 4.5, latest SP and IDES SAP ECC 6.0
Used roles / profiles: SAP_CPR_PROJECT_ADMINISTRATOR / SAP_All
Customizing concerning project roles / WFD:
1. Resource Management > Workforce Deployment Server > Dispatcher Settings > Switch between liveCache and BuiltIn-Dispatcher:
active built in dispatcher defined in dispatcher settings (not the liveCache option).
2. Resource Management > Basic Settings for Project Roles > Define Project Role Types:
no use of WFD-Server in the defined project role types.
3. Resource Management > Qualification Management > Active Qualification Search...:
no User Qualification Comparison of WFM Core (Value abbr. empty).
Hopefully someone can help me with ideas, solutions or documents.
Thanks,
Christoph Lange
Request clarification before answering.
We disabled WFM Core on our cProjects 4.5 using this steps:
1. Enhancement spot CPRO_WFM
a) Use transaction SE18 to create the enhancement spot CPRO_WFM with the short description "cProjects: WFM Integration" in the package PRP_WFM.
b) Create the BAdI DPR_WFM with the short description "cProjects: WFM Integration"
c) Select the specification "Reusing Instantiation" as the instance creation method and expand the node DPR_WFM in the tree on the left.
d) Double-click "Interface", enter the interface IF_EX_DPR_WFM on the detail screen on the right, choose "Change interface", confirm the dialog box with "yes" and create the interface in the package PRP_WFM.
e) Save the enhancement spot.
f) In the interface, enter the public method IS_WFM_CORE_ACTIVE with the description "Is the WFM core active?" and add the following parameters:
Parameter RV_NOT_ACTIVE
Type Returning
Pass value X
Optional
Typing Method Type
Associated TypeXFELD
Default value
Description "WFM core is not active ('X' = yes, ' ' = no)"
g) Activate the interface and the enhancement spot.
2. Implement the attached correction instructions and activate all relevant program objects.
3. Use transaction SE19 to implement the enhancement spot CPRO_WFM.
Hope it will be usefull.
Edited by: Alex Valchuk on Aug 11, 2009 12:27 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.