Hi,

I am currently trying to integrate PPM with PS system and I am struggling to automatically create the PS project Structure from the PPM Project.

I assume that all the required config was made and when I perform automatic PS project creation the status on Project is transferred:

However, when I open the CN43N report in the back-end system, there is no project created.

Could you give me some hints where could be the problem?

Accepted Solutions (1)

Accepted Solutions (1)

sammar81
Product and Topic Expert
Product and Topic Expert
0 Likes

Hi Emil,

Check the accounting integration errors using t- code COCPCPR. It will give you the reason why the project was not created in ECC system..

Cheers

Sammar

emil_lazarski
Explorer
0 Likes

Hi Sammar,

thank you for the correct answer!

Cheers,

Emil