PPM - Linking Portfolio Item to IO automatically via Object Links

former_member301510
Contributor
0 Kudos
268

Hi Experts,

We are creating an Internal order automatically from PPM to ECC via Accounting integration in Project Management.

Both PPM and ECC are separate systems.

I assume, I have done all the required configurations. As a result, I can assign/link IO manually in Object link under Relationship tab of a portfolio item.

Not sure if the system can assign/link IO automatically.

Is it really possible to assign IO automatically as an object link in a Portfolio item? Any relevant BADI/BAPI?

Just as an info, the system is able to assign cProject automatically in Portfolio item as a related object under Relationship tab.

Thanks in advance.

Regards,