This is for PPM 6.1 initial configuration. (Portfolio and Project Management component). My question is at the end.
I have got a new installed PPM 6.1 instance which I have started configuring (functional).
I am following the Config guide for the same.
I need to set up the SM59 Destinations and Portal System Aliases. This is on page 20 of the Config guide (SAP Portfolio and Project Management 6.1 SP01 – February 2015)
I am not having an Enterprise Portal. I am using "Without Enterprise Portal" and HTTP only setup (not HTTPS).
Following needs to be done
Define the aliases listed below as SM59 destinations of type ‘H’ (HTTP)
SAP_cProjects and SAP_RPM:
Both should point to the SAP Portfolio and Project Management back-end system itself.
However the RFC connectivity test is failing - Please see screen shots attached.
I have activated all the required services as per config document and following note also
517484 - Inactive services in the Internet Communication Framework
How can I troubleshoot further?
Request clarification before answering.
Path Pre-fix was missing. This path needs to be derived from services (sicf) and set here. Also a user id and password was set. This resolved the issue.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.