on 2023 Jun 07 3:08 PM
Hello everyone,
We have used this POD before and it worked succesfully but suddenly buttons are no longer working within the Work Center POD.
A different question, can we also use plugin "Consume Materials" instead of "Assemble Components" in the Work Center POD?
Currently for our DEMO we are not assembling components but we are consuming components/backflushing.
Request clarification before answering.
Following up you need the Assemble button like it is configured in the Default POD
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Regarding your second question
I think the material consumption plugin is not available in work center POD.
If you require this feature consider using the Order POD. It is Process Industry-Specific but can also be used with Production orders.
(Configuration in Orderlist Plugin)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.