on 2023 Aug 30 11:04 AM
Hi support team,
We are testing OEE calculation in line monitor app and there is something that don`t understand how it works.
We had defined morning and evening shifts in DMC (08:00-16:00 and 16:00-00:00). When we access to line monitor at 09:30 to see the OEE calculation with current day as time range selected:
You can see that OEE current score is 0,02%, less than I expected. The workcenter BAUSCH has a standard rate for this material of 6 units per minute, I confirmed 100 units and the OEE should calculate the OEE for productive time, so it has to be calculated for the last half and hour, not from 00:00.
We tried to define a new shift (night shift) as non-productive to verify if the problem was that there wasn´t any shift defined for these hours (from 00:00 to 08:00), but the result is the same.
Is it possible to configure the OEE calculation to take into account only the productive time into a shift?
Is it possible that it depends of the resource status?
Thanks in advance
Request clarification before answering.
Hello Piedad,
In SAP DM, Performance KPI is calculated as follows:
Performance = Net Operating Time / Net Production Time x 100%
See all about OEE Calculation formulas here: https://help.sap.com/docs/sap-digital-manufacturing/insights/performance-kpi
You can also check Implementation Considerations and Prerequisites here: https://help.sap.com/docs/sap-digital-manufacturing/execution/overall-equipment-effectiveness
Br,
Manoel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.