on 2013 Nov 27 10:36 AM
Hi,
I have created a new CLASS with CHARACTERISTICS and PHRASES for SAP IH in our Development environment.
I now want to move the CLASS (TAB page) with everything included to our Quality (and then later Production) environments. Preferably with a transport number.
The only way I know currently is to create everything manually in every box!!!
I can upload the phrases with a LSMW.
Any ideas/guideline out there please?
Regards
Marieta
PS - we are not on EHSM .......... using version before that.
Request clarification before answering.
Hi Marie,
So you created class, VAT, characteristics, assigned characteristics to class. The you created phrases, phrase sets, and phrase set assignments. That's how I understood it.
After you created the VAT and saved, this action should have prompted the system to ask for a transport, so I guess you assigned one. In the next tep, you should create the appropriate table-based value assignments for your class and manually assign these entries to the very same transport. Then you bring the transport into Q.
The next step is to create a property tree that contains your new class. Export (NOT transport!) this tree and import it into Q via transaction CG35. This will bring the class, characteristics and their assignment into Q.
Later push the transport from Q to P followed by import of the same property tree.
For the phrases, unfortunately they cannot be transported. But you can export/import them including their assignments to phrase sets. The phrase sets themselves have to be set up manually in each system or you do it automatically in TR CGCZ.
Ralph
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.