Move material entered from one WBS to another WBS or activity in CJ20N

former_member839624
Discoverer
0 Likes
405

If material is entered errantly under a WBS with a corresponding network [4006960] and activity [4945] (like in Fig below). Is it possible to move all or specific materials to the correct or a different WBS and network/activity?

Accepted Solutions (0)

Answers (1)

Answers (1)

Ken_Melching
Product and Topic Expert
Product and Topic Expert
0 Likes

A lot depends on the procurement parameters assigned to the component attachment. Is the project Valuated Project Stock, Non-Valuated Project Stock, or No Stock? Have any of the components been processed further such as open PRs or POs or Goods Receipts?

In the simplest scenario it is very easy to delete a component assignment and create a new one on a different NWA.

What is your situation?