cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

MII Project Version Numbering

Former Member
0 Likes
273

Looking for ideas that others have used to control MII Project versioning when not using NWDI and transports.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

former_member193328
Active Participant
0 Likes

Hi Brad

You may use any versioning tool and backup the project in that tool end of everyday (or earlier if required). You may send the project zip or the whole project as unzipped folders to the tool of your choice (Perforce, GIT etc).

You may use the services in MII to automate this process.

http://<server>:<port>/XMII/Illuminator?service=Transport&Mode=ExportProject&Name=<projectName>

Regards

Partha

Answers (1)

Answers (1)

abesh
Contributor
0 Likes

Agree with Partha above

You can also use this tool to auto backup your projects and configuration :