cancel
Showing results for 
Search instead for 
Did you mean: 

Mass Update Cost Collector

0 Kudos
221

Hello,

I am attempting to update multiple materials through KKF6N at the same time. When I copy all of the materials into KKF6N and create a cost collector, only one part is created. Does anyone know of another way of doing this? I do not have access to MF30 but can request access if needed.

Accepted Solutions (0)

Answers (0)