on 2020 Jul 03 1:28 PM
Hi everyone,
I´m currently looking for a solutions where PMS ist linked with BPM Software, that the Data can flow thrue and everyone can stay in his own system (to explain it short).
Is there any solution from the SAP, for example with PS/ PPM and Change records?
Thanks in advance for your help!
Request clarification before answering.
Hi Leo,
You can do an object linkage of PPM item to PLM change records or cproejcts Tasks to Engineering Record. . Thereby navigating between the two.. if that helps you in your integration..
Regards
Sammar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks Sammar,
that was the answer I was looking for!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.