Issue with Process route in Engineering Records

former_member223190
Participant
0 Kudos
171

Hi Experts ,

I have an problem with the process routes not getting loaded when the status of the Engineering records is changed .

The message displayed is " refresh the application to load the process route data " . I did refresh with " Refresh Icon"

but the process routes are not getting loaded . Can any body please let me know what needs to be done in this case .

The issue is with client which was recently copied and the process route were getting loaded in the source client .

Thanks & Regards
Satish