on 2013 Apr 23 9:53 PM
Cannot automatically create cProjects when PPM Item is saved. I am in PPM 5.0. Have below config in place
Request clarification before answering.
Dear All,
Hope the issue is fixed. I would like to add the points for Portfolio Item to cProject creation automatically.
Before doing this SAP Master switch under Global setting should be present.
10. If default has not been chosen in step 7 then select template in item creation screen and check "create project on saving"
Hope this will resolve the issue for creation
Regards,
Anil Pattanaik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
In configuration you need to link item type to cProject template ( I think it is your step 3), with this option when you create an item you can choose a cProject template, if you don't want to choose you can select in configuration one by default( flag default) .
I think you shouldnt configure step 4 and step 3 for the same kind of projects.
Try to select template by default ( step 3) and delete for your item template settings in step 4 and let us know your result,
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Expert,
Please check this message trial. This should help.
http://scn.sap.com/message/13661462#13661462
// Sreeni
Hello,
No idea what can be the reason of your problem. My advice is review the cProject template and create a very simple cProject template ( with only a project) to check in this case if it is working fine or not.
Check also if you have defined any mandatory field in the cProject that you are not transferring from PPM or entering in the template.
Regards,
Hi Experts,
I am also having a similar problem. I have also done the necessary configurations for now my scenario is this.
When creating an item manually:
1. checkbox for create project when saving is configured and is automatically checked at the time of item creation.
2. project templates i need are all present.
3. After saving it, a cproject is being created.
4. no problem with this scenario
When creating an item using mass upload rpm_dx_item.
1. Item is being created
2. values i put are also present, including the project template i want to use
3. checkbox is unchecked(which is one of the problem)
4. when I tried to check it, then save it hoping it will create a project.
5. item successfully saved but the project is not created
I hope you can help me find a solution to this problem.
thanks,
James
Hi,
The configuration guide in SAP Note 1411953 should help.
Take a look at chapters:
"Defining Settings for Assigning a Project to an Item",
"Defining Settings for Decision Flow Management"
Best Regards,
Brendan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.