Issue while creating raw Material Inspection lot via QA01

0 Kudos
228

Dear Experts,

I am trying to create the Inspection lot of raw material via QA01.

Inspection type is 89 & Inspection plan usage is 9. After creating the quality inspection lot, in QA32 It shows in created status. And also stock is not getting posted in quality from unrestricted, if we check it in the MMBE.

Please suggest. How can we create the inspection lot and for that what will be inspection usage and inspection type.

Thank You.

Accepted Solutions (0)

Answers (1)

Answers (1)

memem
Contributor

Greetings,

I am afraid that the outcome you are trying to achieve is not possible. Manual creation of an inspection lot does not result in stock posting to Q stock.

Since we are dealing with raw materials I assume you are trying to perform GM at goods receipt from vendor. If this is the case you need to:

  • maintain material master - inspection type 01 - make sure its active and you post to QM stock - if this indicator is set, at goods receipt the system posts a material to the stock in quality inspection
  • maintain inspection plan with usage 5 (maintain it with operations, characteristics and sampling procedure)
  • create a purchase order and perform goods receipt with reference to this purchase order
  • perform results recording and usage decision

Bets regards,

Matjaž.

0 Kudos

Thanks for the Quick reply.

I understood your answer properly.

My client want one scenario.

While taking Finished Goods mfg. on shop floor, if the production person finds some lot rejected then he has to send the lot to the inspection. Here it is a raw material lot and not FG lot. So that why i wanted to send the lot to quality for further inspection by quality person only in QA32.

Thanks.

memem
Contributor
0 Kudos

Greetings,

it that case it would be most suitable to perform a goods movement with appropriate movement type to QM stock and customize the system that with the movement also inspection lot is created.

On top of that it makes sense to create a notification to start an internal claim process.

Best regards,

Matjaž.