Hi all,
Im working with cProjects 3.1, <b>not installed in CRM Platform</b>. At this moment I have accounting integration, the system create an internal order to collect the costs.
My doubt is:
If I want to install the cProjects 3.1 in the CRM platform, Im going to have the PS integration (costs and revenues are collected on the Project WBS), but Im going to lose the accounting integration (internal order) or not?
Its possible the multi-object integration (Project and Internal order)?
Thanks,
Alexandra Pires
Request clarification before answering.
Hi,
let me see if i understood correctly, if i install <b>cProjects 3.1</b> in CRM platform im going to have two controlling integrations: CO and PS in simultaneous, correct?
so, when i'll try to replicate the project in R3 i'll have two options:
- create a internal order
<b>OR</b>
- create a WBS structure
Am I correct?
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.