on 2021 Oct 28 9:37 AM
hi,
I am new to SAP ECTR - Solidworks.
having difficulties to assign the Revision Level of DIR ie., Drawing in solidworks to "NA" or "-" without change number.
currently have the workflow with change number will revise and display the Revision Level in the drawing but some already existing drawing in solidworks the revision level tab in table of content is blank.
need to set the blank by NA or "-" as default
Thanks,
Bharath
Request clarification before answering.
User | Count |
---|---|
3 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.