on 2021 Jul 13 6:19 AM
Dear All,
I would like to get the replies for reduced testing for Raw materials and Finished Goods in SAP as mentioned below:
Complete Testing: every, 1st batch and subsequently after every 10th batch (i.e. 11th, 21st and so on..)
Reduced Testing: In between batches shall be triggered for reduced testing.
Which can be the triggering T-code for reduced testing?
Thanks and Regards;
Shital
Request clarification before answering.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.