cancel
Showing results for 
Search instead for 
Did you mean: 

How to configure Reduced testing of Raw material and Finished goods?

0 Kudos
191

Dear All,

I would like to get the replies for reduced testing for Raw materials and Finished Goods in SAP as mentioned below:

Complete Testing: every, 1st batch and subsequently after every 10th batch (i.e. 11th, 21st and so on..)

Reduced Testing: In between batches shall be triggered for reduced testing.

Which can be the triggering T-code for reduced testing?

Thanks and Regards;

Shital

Accepted Solutions (0)

Answers (0)