on ‎2018 Nov 27 5:54 AM
hi guys i have a question about cost centre ,how decisions are made within cost centre?
Request clarification before answering.
thank you for your time anyway
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jamila,
not sure if this is the right tag (SAP Engineering Control Center) to answer your question.
Maybe this is FI/CO?
Regards,
Gerhard
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.