on ‎2011 Oct 13 1:08 PM
Hi Experts,
How do i transport Generation Variant create in CG2B to Quality System..?
Request clarification before answering.
Hi Prakash
Straightfoward options is the Client Copy but this will be done by BASIS people and not by you. Using this method all GV ( Master Data) will be moved.
But if you wanted to move specific GV, then there is no mechanism by which Generation Variant can be transported from Source System to Target System.
or simple way to to create New Generation Variant in Target System. ( Quality System ) .. easiest and most adopted way
Regards
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Prakash
Generation Variant is a kind of Master Data and not the configuration Data. Only Configuration data can be Transported and not master data.
Moreover, Transferring / copying the Master Data e.g. Quantity to Production is a part of Cut Over activities.
In this phase, the Master Data will be moved may be via BDC or LSMW.
Generally this method is being used for very large Master Data e.g. Material Master data for 10,000 Material etc..
Most of the time, Generation Variant list is not as big as other master data thus most adopted method, at least for Generation Variant, is to create the New one in Target System.
Regards
Amol