2025 Jan 27 3:53 PM - edited 2025 Jan 28 12:16 PM
Hello, everyone,
I'm using projects with production.
I would like to know if it is possible to use the project costs to perform the costing of the finished product?
I have a sales order with the Finished Good (FG) and is linked to the WBS at item level.
The production order is generated by the project requirements as described in scope item 6DG.
At the moment the system is only using the costs of the production order to determine the costing of the FG.
In this case it is a make-to-order product where there are many variations that cannot be taken into account in the production order. These variations are then allocated to the project, leading to costs that must be taken into account in the costing of the FG.
How should I proceed?
Thank you,
Best regards,
Rafael
Request clarification before answering.
Hello Rafael,
thanks for your patience.
I consulted with the experts and here's what they suggested:
Kind regards,
JessicaYou must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.