on 2012 Jan 10 4:41 PM
Hi All, I need to know how the entries in table ESTMJ gets created, I am a PP guy has no idea on this table entries. I have checked basic 2 view of material master and none of the boxes checked related to environment and also no haz material number in plant storage view 2.
Request clarification before answering.
Hi,
ESTMJ table is for 'EHS: Specification-Material Assignment'
this means, the Material will get assigned to specification. Material is from logistics side and specification is from EH&S side.
there are 2 ways for this assignment
Method 1: if the EHS specification view is activated for Material Master then you can assign specification to material from this view
Method 2: if that view is not enabled for that Material Type/ Industry sector , the from CG02, open the specification and in Material Assignment tab, you can assign the material to specification.
In this 2 ways you can complete the material-specification assignment and create the entry in ESTMJ.
Regards
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.