hello experts,
I want to do the same change on BOM for different equipment, I can do that one by one through IB02, is there any way to do the same change for 100 equipment in one step?
Regards.
Request clarification before answering.
Hi
You can do the mass change by Engineering work bench
TCode: CEWB