Entry is not coming in Table QIWL for LIMS for Inspection Type 03 ''Inprocess Inspection''.

0 Kudos

We have set 03 Inprocess setting as per

Tick on Inspection With Task List, Check Chars in MM01 in quality management tab, still we are not able to see entry in table QIWL, For 01,09 and 04 Type we have \found entry in QIWL, we have already assign a resource having QDR system for inspection type 01,09, and 04. but we are unable to maintain resource in characteristic in recipe C201.

what are the setting for 03 Inspection lot for LIMS.

Amit Singh

Accepted Solutions (0)

Answers (1)

Answers (1)

0 Kudos

I have solved this, so i am closing this call.

0 Kudos

Glad you solved this!

Would you mind sharing which LIMS you are working with. (We are facing similar issues with FP-LIMS SAP R/3 integration)