on 2018 May 14 8:17 AM
Hi,
We are performing ECC Quality Inspection, triggered from an EWM inbound delivery. This was working fine when we did setup the inspection in EWM on product level. It worked then for both external vendor POs as also for STOs.
But we wanted to base the inspection on product-vendor combination from ECC QI06 masterdata. Now we transfer QI06 records from ECC to EWM QRSETUP. But now only PO scenarios work. In an STO scenario EWM still recognizes the product should go to quality inspection, but it does not trigger the ECC QM lot anymore.
regards,
Arjen