cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

cProjects - PS - CATS

Former Member
0 Likes
222

Hello,

wow. Today a have a lot of questions, sorry

I am using cProjects with hierarchical controlling in PS.

Is it possible to use the network (and not the wbs element) for entering the working time and if yes how could this happen?

Thx, Max

Edited by: Maximilian Glänzer on May 26, 2008 4:14 PM

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Likes

As far as I know only WBS elements integration is allowed.

Kind regards,

Neil

Former Member
0 Likes

Unfortunately I also think so. But I hope that someone could say something else...

former_member201206
Active Contributor
0 Likes

Hi Max,

After cProject 4.0 it is not possible to replicate the cProject -> R/3 network, in cProject 3.1 the funcatinality (via CRM middleware) is possible, you can do the CATS linked to network too.

Kind regards,

Zhenbo

Former Member
0 Likes

Thx for all your comments. I think there won't be any answers saying something else than you both.

Answers (0)