on ‎2007 Nov 02 3:03 PM
Can you display planned costs in cprojects after doing financial integration(Calculated on Role/Task revenue rates) against each phase or task without going into each individual task separately.
Which all options of displaying planned costs are available and how are these configures ?
Is this carried out via the planning mechanism chosen Role-based resource planning or Task Based.If yes, Where do you specify which of the 2 options to choose ?whether you want to choose role based or task based planning.
Request clarification before answering.
Hai Pooja
Costing is carried out in cProjects based on the project roles r tasks.
Reg tasks based cost planning u can assign the required capacity to the individual tasks during the planning of the project structure.This required capacity is multiplied by the cost/revenue rates ti determine the planned costs and planned revenues.
Task is done by a role - means for example Project Manager specifies which positions are to be filled up - these positions are called in cProjects as Roles(resources for the project). Thye are assigned to the tasks in which the positions are involved.
Check the configuration in - SPRO - cProjects - Connection to external system - Accounting Integration - Integration using Single Object Controlling in SAP R/3 CO - Make General settings
ENJOY mySAP PLM
Regards
PP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.