on 2006 Nov 20 2:30 PM
Dear all,
I need to inegtrate cProjects with PS. How can I do it?
I need to create a project in PS from cProjects.
Kindly provide a detailed explanation of how this can be done.
Regards,
Reema.
Request clarification before answering.
Hi all,
Im working with cProjects 3.1, <b>not installed</b> in CRM Platform. At this moment I have accounting integration, the system create an internal order to collect the costs.
<b><u>My doubt is:</u></b>
If I want to install the cProjects 3.1 in the CRM platform, Im going to have the PS integration (costs and revenues are collected on the Project WBS), but Im going to lose the accounting integration (internal order) or not?
Its possible the multi-object integration (Project and Internal order)?
Thanks,
Alexandra Pires
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.