Hi,
I am looking for cProjects 4.0 integration with the other SAP modules - SD, MM etc. Can someone please suggest some document/information?
How is a cProjects ID linked to a sales order? Which one ought to come first - the cProject ID or the sales order? And is there any flexiility?
Thanks and Regards...
Request clarification before answering.
Hi,
cProjects 4.0 can be integrated with SAP PS through multilevel controlling feature. By doing this, we can get a corresponding PS project. Also you can integrate with SAP CO by creating an internal order. This is acheived through accounting integration. By using object links feature cProjects 4.0 project can refer to a sales order, R/3 document, R/3 plant material, R/3 WBS element etc. We can also integrate with SAP DMS. Within cProjects 4.0 you can create Document info record and upload documents into it and that gets reflected in SAP DMS. Other integration scenarios: By using SAP Portal drive, cProjects 4.0 can be integrated with Windows file explorer. Also you can initiate a cFolders collaboration from within cProjects 4.0
regards
Anantharam
p.s. In case you are satisfied with my reply kindly give me points
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi all,
I need to know which integration we have between cProjects 3.1 and SAP components (e.g. do we have accounting integration with PS and CO?).
And which integration we have between cProjects 4.0 and SAP components.
Thanks,
Alexandra Pires
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Anantha,
Still waiting for the documents on this subject you said you'd send.
Thanks very much,
Regards,
(Bittu_Parashar@yahoo.co.in)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Anantha,
Thanks for your inputs. I look forward to your mail on the subject at
Bittu_Parashar@yahoo.co.in
Thanks...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for the details...
Using object links can I link one cProjects ID to more than one sales order?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Bittu,
If you just want to link sales orders, you can do it at multiple times for a cProject ID. You can also link sales orders in different systems, but in such case, you need a different object link type, as the target system difinition of object link type is different.
For some so called Integration (not a link only) functionality, the program should create the object link automatically during process.
Please rewards, wenn the information is usefull.
Kind regards,
Zhenbo
Hi Bittu,
It is very much possible to link as many sales orders to a project element. In case you need more information about linking R/3 objects to project elements please let me know your email address and i would forward you related documents.
thanks
p.s. In case you find this information useful, please kindly reward points
Hi Bittu,
Please use the following which talks about the Sales Order processing in cProjects in ECC 6.0 and also see SAP Note 874434
http://help.sap.com/saphelp_ppm400/helpdata/en/22/ce1c42f7b45233e10000000a155106/content.htm
regards
Yasar