cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Cost/rev rate issue

Former Member
0 Kudos
173

hi,

we have 5 types of roles mapped to 5 different cost per rev. rates. Demand is configured to roll up from cProject to item. Also, the capacity group to financial group mapping is done for all the 5 cost rev rate. Now when i give 1 hour of demand at cProject against a role type, the costing tab in cProject automatically changes to the respective cost per rev. rate. But when i look at the financial view of the corresponding item after running the Integration program, i see the sum of all the rates.

Example:- I give 1 hour of demand against a role type mapped to $30 Cost/rev rate at the cProject and i expect to $30 against the respective month on the time level. But i see $200 (which is the sum of all the 5 different Cost rates).

i looked for SAPnotes and i found 1529610 & 1637728. However, these notes have not resolved the issue yet.

Pls advise.

View Entire Topic
Former Member
0 Kudos

Found that when the demand is made to roll up from cProject to item it is the role functions that have to be mapped to cost/rev rate and not the cap. groups. Since each group was mapped to all the five rates it was adding up. When i deleted all the cap group mappings and made only role function mappings the cost were coming OK.