on 2018 Nov 13 1:25 PM
Hello All,
When NC is raised, the SFC goes to a special operation from where we send it back to the original route from ME.
The special operation is also maintained in ECC. But when we complete the special operation (NC Route)from the same POD , No Labor Request goes to ECC. Though we have maintained the LT380 activity in Complete button of POD.
Thanks & Regards
Dibyadeep.
Request clarification before answering.
Hi Bibyadeep,
With default settings of Labor Off, labor is not collected for Special operations or NC routes.
In Activity ‘Labor Off’, change the setting of rule ‘ROLL_UP_TO_PROD_STEP’ to YES and check.
Thanks,
Shridhar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Dibyadeep,
In order to show/trigger CollectWorkTime when you do NC, you have to configure your Scheduling Standards Maintenance->Routing: You have to specify here your NC Routing where you want to disposition or send the SFC to. See Below screenshots. Then open details to see the Material_Routing Level Details. Here you can specify your Standard Value Key.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Shridhar,
Thanks for your suggestion , I tried the solution but still no collect work time plug in appeared.
Regards
Dibyadeep.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.