Change Process Flow Item Type A (DP 4) with Item Type B (DP 3)

former_member613562
Participant
0 Kudos
155

Hi

I have a scenario where I need to map the status of 4 DP of Item Type A with 3 DP of Item Type B under the change process flow

Item Type A - Consist of 4 DP

Item Type B - Consist of 3 DP

Is there a way in where I can map the Status of the 4th DP of Item Type A with the 3rd DP of Item Type B, As per the current setting I can map 1 to 1 mapping i.e Item Type A DP 1 is mapped to Item Type B DP 1, Item Type A DP 2 is mapped to Item Type B DP 2 and Item Type A DP 3 is mapped to Item Type B DP3, thus I am unable to maintain DP 4 of Item Type A with any DP of Item Type B

Thanks and Regards

Accepted Solutions (0)

Answers (1)

Answers (1)

0 Kudos

Hello Simon,

I have the similar scenario where along with Item Type change there is a also a Decision point shift/jump. Could you resolve your requirement? If yes, it could help me in addressing requirement at my end.

Sreeni