cancel
Showing results for 
Search instead for 
Did you mean: 

Avoid parallel assignments(multiple assignments in the same timeframe) to a single resource or team?

0 Kudos
187

Hi MRS Experts.

My MRS Planning board allows the same operation to be assigned to the same resource multiple times. The utilization also reflects this duplication. For example, I can assign the same operation(of 1 hour for example) to the same resource, multiple(say for example 3) times. This will create multiple(3) parallel assignments against this resource and his utilization will also show 3 hours.

In the similar manner, my MRS Planning board allows more than one demands to be assigned to the same resource in the same time frame. To illustrate, I have order 12345 with operation 1 from 9 am to 11 am and operation 2 from 10 am to 12 pm. I have a resource X. I can assign operation 1 to resource X from 9 am to 11 am. I can also assign operation 2 to the same resource X from 10 am to 12 pm. This will create parallel assignment (collision) from 10am to 11am. But my business user requires MRS to shift the operation 2 to the next available slot of resource X. So if the resource X is free after 11 am, the assignment for operation 2 should be created in series(not in parallel) from 11 am to 1 pm.



Please advise how to achieve this, because it is a serious anomaly from the business standpoint.

Your help is very much appreciated.

Regards,

Indranil.

Accepted Solutions (0)

Answers (0)