Inside the SAP Enterprise Product Development launchpad you find the section for configuration management. | ![]() |
From the ‘Manage Configuration Plans’ app, trigger the creation of a new configuration plan – the ‘Create’ button is located above the list of existing configuration plans. | ![]() |
Then enter the lifecycle phases that you plan to track for the configuration plan in the corresponding section. Long texts and comments can also be used to improve communication with the consumers of the lifecycle phase. | ![]() |
Create the baseline either from inside the lifecycle phase application – or directly inside of the baseline application. During the creation, you need to select a connected source system (S/4HANA or SAP ECC). | ![]() |
The empty baseline is being filled in a next step with the data (multi-level BOM, Material Master, DIRs) coming from the source system. ‘Pull Master Data Objects’ starts the upload procedure. The required entry for the BOM Application refers to the BOM explosion logic as defined in the connected source system. | ![]() |
As a result, now the multi-level BOM is saved as a baseline with an identifier, a status and a description. This makes it easy to communicate based on this identifier. | ![]() |
Once the correctness of the structure is validated this can be documented with the built-in status management. Also the URL of the baseline could be sent via email. | ![]() ![]() |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.