on 2023 Jul 12 9:54 AM
Hi All,
Kindly share if anyone has experience in configuring Benefit in SF with specific period taken from Job information. The case is Benefit type was created but the Period needs to read the date on Job Information as the schedule.
Thank you,
Amalia
Request clarification before answering.
Hi
what is the requirement that you need to trigger benefits based on Job information periods. It does not work that way . Through the Life events you can trigger the benefits based on events -Like Hire, Terminate , or you can trigger based on life events-Like marriage , child birth etc.
Please share the exact requirement , to help.