cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Work status data Rejected in the Script logic in BPC NW 10.1

former_member254404
Participant
0 Likes
510

Hi Guys ,

We are using the SAP BPC NW10.1 with HANA database

We Submitted the Work status in the specific data region ... My Id has been assigned as Owner

When I load the data in the Input schedule, Data is saving in BPC . However .After saving , data is rejected in the script logic . Can you please check and revert

2134 RECORDS ARE Rejected:
ACCOUNT ACCT_DETAIL ANALYTIC1 ANALYTIC3 CATEGORY COST_CENTRE DATASRC GROUPS INTCOL LEGAL_ENTITY PRODUCT RPTCURRENCY TIME SIGNEDDATA ERROR MESSAGE
INP_OH_ID_005 F99 NONE1 NONE3 BUDGET PLC102 DSRC_ORG NONE_GRP I_NONE TZ11 12CAPL LC 2018.DEC 0.00
INP_OH_ID_005 F99 NONE1 NONE3 BUDGET PLC103 DSRC_ORG NONE_GRP I_NONE TZ11 12CAPL LC 2018.DEC 0.00

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member254404
Participant
0 Likes

Okay Vadim .. I posted New issue in the Tag of

SAP Business Planning and Consolidation, version for SAP NetWeaver

Can you advise .. Your saying to check my Script logic Scope ?

former_member186338
Active Contributor
0 Likes

"I posted New issue in the Tag of

SAP Business Planning and Consolidation, version for SAP NetWeaver"

Absolutely incorrect Idea! Violating the forum rules.

You have to correct this question, not post a new one. Please delete your new question and correct this one. Moderator alerted!

former_member186338
Active Contributor
0 Likes

"Your saying to check my Script logic Scope" - post your default.lgf!

former_member186338
Active Contributor
0 Likes

First - the question has no relation to the tag:

EPM Add-In for Excel

Please change to the correct:

SAP Business Planning and Consolidation, version for SAP NetWeaver

Second: If Work status is locked for some scope then default.lgf will show rejected records. There is no way to write data using script logic to the locked scope.