on ‎2015 Jul 27 5:39 PM
Hi All,
when I refresh(copy) from production to quality using UJBR in BPC, some workbooks are not copied into quality. we have to manually add these workbooks into quality. We copy the system to test real time scenerios. is there any way to check what objects are copied and how UJBR works in background.
please help me out.
Thanks in advance.
Vishal
Request clarification before answering.
Hello,
Please confirm that workbooks are saved on the server and not locally on the user's client machine.
Regards,
Leila
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vishal,
UJBR is backup/restore tool - has to save and restore everything if settings of the backup includes everything. You can open backup zip file and check for the workbooks in question!
Vadim
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We have BPC 10.0 installed as an add-on to our SAP BW 7.3 system
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 8 | |
| 6 | |
| 6 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.