cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Scheduling BPC Package with incremental Paramemter

former_member590808
Participant
0 Kudos
221

Hi,

We have a package which every month fetches last year's data for that month. Eg on 15th Mar'19 it will fetch data of Mar'18. Now I have scheduled this package by manually creating multiple package with incremental months. Is it possible to schedule a single package in BPC which manually increments the Time Period and executes periodically? Eg. on 15th of every month it fetches previous year's data for that month .

Regards,

Neha

Accepted Solutions (1)

Accepted Solutions (1)

former_member186338
Active Contributor
0 Kudos

Please read my blog: https://blogs.sap.com/2018/11/23/how-to-run-dm-package-with-current-month-selection-in-bpc-nw/

Only small adjustment to the code required!

Answers (0)