We plan to do hourly delta loads within BPC models during the day and a full load over night. Therefore we have to reset the Delta Initialization before the full load in the night. Is there a possibility to reset the delta initialization as a scheduled package (BPC process chain, ABAP etc.) ?
Request clarification before answering.
Thanks Vadim for your reply.
Yes I do trust in BPC delta load but there is a full load in the source (where I don't have any influence). Consequently the next "delta" load would be a full load anyway and we have double data.
Any suggestions for the scheduled reset of delta initialization?
Thanks and regards
Daniel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Strange idea to perform full load after delta load! You don't trust delta load????
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 8 | |
| 6 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.