on 2019 May 03 10:42 AM
We plan to do hourly delta loads within BPC models during the day and a full load over night. Therefore we have to reset the Delta Initialization before the full load in the night. Is there a possibility to reset the delta initialization as a scheduled package (BPC process chain, ABAP etc.) ?
Request clarification before answering.
Strange idea to perform full load after delta load! You don't trust delta load????
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 7 | |
| 7 | |
| 7 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.