on ‎2018 Feb 08 6:57 AM
Hi,
I will be initiating transports for RTC to target system.
How will the foundation view copied from Sap.erp.sfin.rtc will get copied to client specific pacakge. Can I just transport the model and it will generate that in HANA or I need to perform any transports between hana instances by using development unit or something?
Or only the transports from ABAP layer will be suffice?
What are the other important aspects that needs to be taken care of ?
Thanks
rakesh
Request clarification before answering.
1- Transport the foundation view. This can be done via T-code SCTS_HTA.
2- Transport the RTC objects (S/4)
3- Generate objects (other hana/cds views).
3- Transport BPC and BW objects
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check 2511574 - Checkpoints for BPC Integration and Configuration in the Real-Time Consolidation (RTC) in S/4HANA
There is a section around transport
| User | Count |
|---|---|
| 41 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.