cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Question about authorizations so that work status works properly

Former Member
0 Likes
362

Hi all,

we are on BPC 10.1 SP4

I have a question regarding work status so that the data is actually locked. I have configured the work status functionality according to the documentation so that I can set work statuses in the input schedule.

When I set the work status to a status where the data should be locked the data is not locked.

In the BPC system I have all administrator roles.

Is it possible that I have too many authorizations so that the data is not locked.

Which authorization may a user not have so that the work status functionality works as expected?

Thanks in advance and best regards

Gerd

View Entire Topic
akos_beres
Contributor
0 Likes

Gerd,

Work status works somewhat independent from system authorization. You can't have too much authorization. Work states are saved in a table and BPC checks the table to evaluate if the area is locked or not. Can you check the work status audit report or create something in Excel using EPMWorkstatus to check if the data intersection is truly locked.

Akos